Quick Answer

A standard 300mm diameter × 600mm deep concrete pier requires 0.042 m³ of concrete (about 5 × 20kg cement bags pre-mix). For most Australian fence and deck posts, use a pier 3× the post width and 600-900mm deep depending on soil class.

Enter values and click Calculate Concrete to see results.

How Deep Should a Concrete Pier Be?

Pier depth in Australia depends on soil class (per AS 2870), wind region, and load:

  • Class A or S (sand/gravel): 450-600mm deep for fence posts, 600-750mm for deck/pergola
  • Class M (moderately reactive): 600-750mm fence posts, 750-900mm deck/pergola
  • Class H (highly reactive clay): 750-900mm fence, 900-1200mm deck/pergola, engineer often required
  • Class P (problem): Always engineer-designed

Diameter rule of thumb: 3× the post width. So a 90mm post needs a 270-300mm pier.

Worked Example: Pergola Post Footings

You're installing 6 pergola posts on a Class M site in Brisbane. Each pier is 300mm diameter × 750mm deep.

  • Volume per pier: π × (0.15)² × 0.75 = 0.053 m³
  • Total: 0.053 × 6 = 0.318 m³
  • Plus 5% wastage: 0.334 m³
  • 20kg bags needed: 0.334 ÷ 0.011 = ~30 bags
  • OR ready-mix: round up to 0.4 m³ (minimum 0.2 m³ truck delivery)

FAQs

How many bags of concrete in a 300mm × 600mm pier?

About 4-5 × 20kg pre-mix bags. The pier holds 0.042 m³ of concrete and each 20kg bag yields approximately 0.011 m³.

Is bagged concrete cheaper than ready-mix?

Bagged is cheaper for under 10 piers (under 0.5 m³ total). Ready-mix becomes cost-effective above that, with truck delivery typically $250-350 minimum charge.

Do I need an engineer for fence post piers?

Not for residential fences under 1.8m on Class A, S, or M soil. Engineer required for Class H/P sites, fences over 1.8m, or commercial work.

What MPa concrete should I use for piers?

20 MPa (N20) for residential fence and deck posts. 25 MPa for engineered structural piers. Higher MPa for commercial work per AS 3600.

Need more than a calculator?

Built Simple does estimating, scheduling, time tracking, and team management, all in one app.

Try Free for 14 Days

Need the total volume first? The concrete calculator works out cubic metres for slabs, footings, columns and post holes, then come back here for the detail.

Call 03 7303 3694 Text 0485 028 458

Get this in the app, freeSave this result to a free account

Every calculator, one tap away in Built Simple. Sign up free and skip the search next time.Keep your take offs, quotes and job schedule in one place. Free to start, and every calculator comes with it.

Get the free appCreate my free account
Download on theApp Store Get it onGoogle Play

Also on iOS and Android, with the same free account.