m

Plumbing Fall Formulas

Fall per Metre: 1000 ÷ Grade Ratio (e.g. 1:40 = 25 mm/m)
Total Fall: Pipe Length × Fall per Metre
Grade Percentage: 100 ÷ Grade Ratio

Note: Grades shown are minimum requirements per AS/NZS 3500. Always check local council regulations.