m
mm
mm
m

Retaining Wall Calculation Formula

Courses: ceil(Wall Height ÷ Sleeper Height)
Sleepers per Course: ceil(Wall Length ÷ 2.4)
Total Sleepers: Courses × Sleepers per Course
Posts: ceil(Wall Length ÷ Post Spacing) + 1
Concrete per Post: 0.05 m³
Total Concrete: Posts × 0.05 m³

Note: Sleeper length assumed at 2.4 m standard. Concrete per post based on 450 mm diameter × 300 mm deep footing.