Construction Regulations 2014: site paperwork in SA

loader

TL;DR: The Construction Regulations 2014 require paperwork on every building job: the client's baseline risk assessment and health and safety specification, the principal contractor's health and safety plan and file, a fall protection plan wherever people work at height, and written appointments for the people who manage and supervise the work. Larger jobs need a construction work permit before work starts. Smaller jobs that involve excavation, work at height, demolition or explosives need a written notification instead. When a Department of Employment and Labour inspector arrives, the health and safety file is the first thing they ask for.

The Construction Regulations 2014 are made under the Occupational Health and Safety Act 85 of 1993. They apply to construction work across South Africa, from an alteration on a single house to a multi-storey commercial build, and the Department of Employment and Labour enforces them. They are separate from the plan approval you get from the municipality. The National Building Regulations and SANS 10400 govern what you build. The Construction Regulations govern how safely you build it and what you keep on file to prove it. This guide covers that paperwork: who prepares each document, when it is needed, and what an inspector will check.

Who does what under the Construction Regulations 2014?

The regulations give duties to four parties, and most problems on site start when one party assumes another has handled something.

  • The client is the person the construction work is done for. This can be a developer, a business or a homeowner. Client duties apply whether or not the client knows they exist.
  • The designer has to take the client's health and safety specification into account in the design.
  • The principal contractor is appointed by the client in writing to carry out the work. It runs the site, the plan and the file.
  • Contractors are the subcontractors and trades the principal contractor brings on. Each one has its own duties under the plan.

Throughout the regulations you will see the phrase competent person. It means someone with the knowledge, training and experience for the specific task, plus qualifications where they apply, who is familiar with the Act and the regulations. Most written appointments on site have to go to a competent person, so keep evidence of that competence in the file alongside the appointment letter.

A note on currency: on 12 March 2025 the Department published draft Construction Regulations for public comment in Government Gazette 52267, and comments closed on 12 June 2025. The draft would repeal the 2014 regulations. As at October 2026 no final version has been gazetted, so the 2014 regulations still apply. Check the Department of Employment and Labour for the current status before you rely on any clause below.

What does the client have to prepare before the job goes to tender?

Regulation 5 sets out the client's duties, and they start well before anyone breaks ground. The client must:

  • prepare a baseline risk assessment for the project. This document identifies the main health and safety risks of the work.
  • prepare a health and safety specification for the site, based on that baseline risk assessment.
  • give the specification to the designer and include it in the tender documents, so every tenderer prices the same safety requirements.
  • appoint every principal contractor in writing and be satisfied that the principal contractor has the competencies and resources to do the work safely.
  • make sure that, before work starts, every principal contractor is registered and in good standing with the Compensation Fund or a licensed compensation insurer.
  • discuss and negotiate the principal contractor's health and safety plan, and then give it final approval for implementation.
  • make sure health and safety audits and document checks happen at the agreed intervals, and at least once every 30 days.

When a construction work permit is required, regulation 5 also requires the client to appoint a competent person as its agent. The agent must be registered with the statutory body approved by the Chief Inspector, which is the South African Council for the Project and Construction Management Professions (SACPCMP), approved under Government Notice R. 85 of 2014. Appointing an agent does not take any responsibility away from the client.

Home builders working for private owners face a practical gap here. A homeowner usually has no idea they have client duties. A principal contractor who wants a clean file should raise this at quoting stage rather than at the first inspection.

What goes into the principal contractor's health and safety plan?

The health and safety plan is the principal contractor's response to the client's specification. It is a documented plan for the site, the activity or the project, and the client must approve it before work starts.

Regulation 9 is the base the plan rests on. A contractor must have risk assessments done before construction work starts and while it continues. The person doing them must be a competent person appointed in writing. Each risk assessment identifies the hazards people may be exposed to and analyses and evaluates them using a documented method. Safe work procedures to control those hazards follow from it. The risk assessments become part of the health and safety plan on site.

Every contractor under the principal contractor also has to work to a plan. In practice, each subcontractor's plan goes to the principal contractor for approval. The principal contractor also has to be reasonably satisfied that a subcontractor has the competencies and resources to work safely before appointing it. If a subcontractor's plan is not approved, the principal contractor should not let that subcontractor start work.

What does the health and safety file need to contain?

Regulation 7(1)(b) is short and specific. The principal contractor must:

"open and keep on site a health and safety file, which must include all documentation required in terms of the Act and these Regulations, which must be made available on request to an inspector, the client, the client's agent or a contractor."

That sentence is why the file sits in the site office and not on a laptop in head office. Because the regulations require it, the file should hold:

  • the construction work permit or the notification (see below)
  • the client's baseline risk assessment and health and safety specification
  • the approved health and safety plan, and the approved plans of each contractor
  • the risk assessments and safe work procedures
  • every written appointment, with proof of competence
  • the fall protection plan, where one is needed
  • inspection registers, such as the temporary works register
  • audit reports
  • Compensation Fund letters of good standing
  • an up-to-date list of contractors on site, the agreements between the parties and the type of work each one does

At completion, the principal contractor has to hand a consolidated health and safety file to the client. It must include a record of the drawings, designs and materials used and other similar information about the finished structure. If you keep the file up to date throughout the job, the handover is a matter of collecting what you already have. If you leave it to the end, rebuilding it from memory takes far longer.

When do you need a fall protection plan?

Regulation 10 applies wherever people on site work at a height where they could fall. The contractor must designate a competent person to prepare a fall protection plan and must make sure it is put in place, kept up to date and followed.

The plan has to cover:

  • a risk assessment of all work carried out from a fall risk position
  • the process for evaluating employees' medical fitness to work at height, with records
  • a training programme for people working at height, with records
  • procedures for inspecting, testing and maintaining fall protection equipment
  • a rescue plan setting out the procedure, people and equipment needed to rescue someone immediately after a fall incident

The construction manager must hold the most recently updated version of the plan. The regulation prefers fall prevention, such as guardrails and platforms, over fall arrest, such as harnesses. Fall arrest equipment is for situations where prevention is not reasonably practicable. Roof work has its own extra conditions in the same regulation, so on a re-roof or a new roof, read regulation 10 through before you price access. Use the roof pitch calculator to check the pitch you are working on before you plan access and edge protection.

When does a job need a construction work permit?

Regulation 3 requires the client to apply in writing to the provincial director of the Department of Employment and Labour for a construction work permit, at least 30 days before work starts. The original 2014 text required a permit for work over 180 days, over 1 800 person-days, or a works contract of R13 million or more (CIDB grade 6), and a temporary exemption later raised that bar. Notice 850 of 2018 applies to work starting from 7 August 2018. Under it, a permit is needed where the work will run longer than 365 days and involve more than 3 600 person-days of construction work, or where the tender value falls within CIDB grade 7, 8 or 9.

The notice sets the thresholds by duration, person-days and CIDB grade rather than naming a Rand figure of its own. The notice is an exemption, so confirm with the provincial office of the Department that it still applies to your start date.

Once a permit is issued, the site gets a site-specific number. The number must be displayed at the main entrance to the site. It cannot be transferred to another site. No permit-level work may start until the permit and number have been issued.

Smaller jobs still have a step. Under regulation 4, a contractor doing work that does not need a permit must notify the provincial director in writing at least 7 days before work starts if the work includes:

  • excavation work
  • working at height where there is a risk of falling
  • demolition of a structure
  • the use of explosives

The same 7-day notification applies when you build a single-storey dwelling for a client who will live in it after completion. The notification form asks for the name and telephone number of the construction supervisor. A home builder doing new houses will meet this rule more often than the permit rule. This notification is separate from NHBRC home builder registration and new-home enrolment, which are two more steps of their own. Our NHBRC registration guide covers those.

Who on site must be appointed in writing?

The phrase "in writing" appears throughout the Construction Regulations 2014. A verbal "you're running site" does not meet it. The main appointments are:

  • The principal contractor, appointed by the client (regulation 5).
  • The construction manager, under regulation 8(1). The principal contractor must "in writing appoint one full-time competent person as the construction manager with the duty of managing all the construction work on a single site, including the duty of ensuring occupational health and safety compliance". An alternate must be appointed for when the construction manager is absent. A construction manager may not manage work on any other site.
  • Assistant construction managers, where the size of the project calls for them. Appointing them does not relieve the construction manager of personal accountability.
  • The construction health and safety officer, full-time or part-time. The contractor appoints this person after consulting the client, based on the size of the project and the hazards on it. The officer must be registered with the statutory body the Chief Inspector has approved.
  • Construction supervisors, appointed in writing by the construction manager. Competent employees can also be appointed in writing to assist them, with their duties set out in each appointment.
  • The risk assessor, under regulation 9.
  • The person responsible for the fall protection plan, under regulation 10.
  • The temporary works designer and the person supervising temporary works, under regulation 12. Temporary works must be inspected immediately before, during and after concrete is placed, after bad weather or any other imposed load, and at least daily until they are removed, with the results recorded in a register on site.
  • The scaffolding supervisor, under regulation 16. This person supervises all scaffolding work and confirms that the erectors, team leaders and inspectors are competent.

Regulations 13 (excavation) and 23 (construction vehicles and mobile plant), and the other activity-specific regulations, add supervision and inspection duties of their own. Check each one that applies to your job. Every appointment letter should name the person, the site, the duties and the date, and the appointee should sign it to accept the appointment.

What does a Department of Employment and Labour inspector ask to see?

Inspectors have powers under the Occupational Health and Safety Act to enter a site, ask questions and inspect documents. They can also issue notices, including a prohibition notice that stops work. In practice, an inspection usually covers these points in roughly this order:

  1. The site number or notification. Is the permit number displayed at the main entrance? If the job did not need a permit, was the regulation 4 notification sent?
  2. The health and safety file. Is it on site, and is it current?
  3. The approved plan. Is the health and safety plan signed off by the client, and do it and the specification match the work actually happening?
  4. Appointments. Are the construction manager, supervisors, risk assessor and any activity-specific appointees appointed in writing? Do the letters name the people who are actually on site today?
  5. Risk assessments. Is there a current assessment for the task in front of them, such as a trench, a scaffold or work on a roof?
  6. The fall protection plan, if anyone is working at height.
  7. Registers and audits. Are scaffold and temporary works inspection records up to date? Are the audit reports no more than 30 days apart?
  8. Contractors. Is there a list of contractors on site, their approved plans and their letters of good standing?

The gaps inspectors find most often are documentation gaps, not gaps in the physical work. Common examples are an appointment letter for a supervisor who left months ago, a risk assessment written for a different site, or a fall protection plan that nobody updated when the roof design changed.

Frequently Asked Questions

Do the Construction Regulations 2014 apply to a small house build? Yes. The regulations apply to construction work generally, not only to large projects. A single-storey dwelling for a client who will live in it needs a written notification to the provincial director at least 7 days before work starts. The plan, file, risk assessment and appointment duties still apply to the work. The 2025 draft regulations would exclude this type of work, so check their status before relying on this answer.

Who applies for the construction work permit, the client or the contractor? The client applies, in writing to the provincial director, at least 30 days before work starts. The regulation 4 notification for smaller jobs is the contractor's duty.

Is the health and safety file the same as the health and safety plan? No. The plan is the principal contractor's documented approach to controlling the risks on the job, and the client approves it. The file is the collection of all documents the Act and the regulations require, including the plan. It is kept on site and handed to the client in consolidated form at completion.

Can the construction manager run two sites? No. Regulation 8 says the construction manager may not manage construction work on any other site. An alternate must be appointed for when the construction manager is absent.

Where can I read the regulations themselves? The regulations were published as Government Notice R. 84 in Government Gazette 37305 of 7 February 2014. As official legislative text, they may be quoted. The Department of Employment and Labour publishes the regulations and later notices, and it is also where you should check the status of the draft regulations that would replace them. For other job-site numbers, see our South African construction calculators.

Keep the compliance paperwork on the job it belongs to