A new survey reported by Australian Conveyancer names construction costs as the main barrier to home supply. Anyone who prices jobs for a living already knew that. What changes is the conversation at the kitchen table, because construction costs Australia-wide are now the story your clients read on the news before they read your quote.
That makes the next few months a quoting problem more than a market problem. Clients will push harder on price, developers will test whether a project still stacks up, and the builder who can show a clear, current number keeps the job. Here is how to be that builder.
What the headline does and does not tell you
A survey result tells you what the industry is worried about. It does not tell you what framing timber, steel or concrete will cost on your next job, and it does not set your rates.
For the exact findings, read the source article and the survey behind it. For hard numbers, the Australian Bureau of Statistics publishes building and construction statistics, such as building approvals and activity. HIA and Master Builders Australia also publish regular commentary on conditions. Treat all of it as background. Your quote is built from your own supplier prices and your own labour rates, not from a headline.
Construction costs Australia-wide: the part you can control
You can't set the price of timber or reo. What you control is how fast a price change reaches your quote.
- Date every supplier price. A price from three months ago is a guess. Put the date next to every line in your take-off.
- Set a short validity period. State how long your price holds and what happens after that.
- Take off from the plans. Size framing from the AS 1684 span tables for the actual job, not from the last job that looked similar. Over-ordering is a cost rise you give yourself.
- Price by area from your own jobs. Work out your cost per square metre from finished work and update it every few jobs. Our guide to calculating square metres covers the measuring side.
- Order concrete to the job. For small pours, work out your bags with the concrete calculator. For ready-mix, many suppliers charge for short loads and waiting time, so plan the delivery around the pour using our guide to scheduling concrete pours.
A margin check with illustrative numbers
These figures are an example, not industry averages. Say a job is priced at $400,000 ex GST (the client sees $440,000 once the 10 percent GST is added). Materials are $160,000 of that and your net margin is 10 percent, so $40,000 profit.
Materials rise 5 percent between quote and order. That is $8,000 you did not price for, a fifth of your profit gone before the crew has picked up a tool. At a 10 percent rise it is $16,000, which is 40 percent of the profit.
Key takeaway: On a thin margin, a small rise in materials is a big cut to your profit.
Work this check in ex GST figures. If you are registered for GST, the GST you pay on materials comes back as an input tax credit, so the ex GST amount is the real hit to your margin. Ask your accountant how it applies to your situation.
Quoting habits that hold up when prices move
- Define provisional sums and prime cost items. Put a defensible allowance in the contract, so a client's pick of tiles or tapware that costs more than the allowance is a variation, not your loss.
- Get variations in writing before the work. Most state domestic building laws require it, and it is the cheapest protection you have.
- Check your state's rules on price escalation. Rules on rise and fall clauses in domestic building contracts differ by state, so confirm with your state regulator before relying on one.
- Track quote against actual. After three or four jobs you can see which lines keep blowing out. If a spreadsheet is doing that job badly, our roundup of the best construction project management software is a fair place to compare options.
Owner-builders, the same habits apply to your budget. Get dated prices before you commit, and keep a contingency line for the items that move.
What to do this week
Pick your five most-used materials and get fresh written prices. Then re-run your cost per square metre against your last three jobs. If the number has moved, your quotes should have moved with it.
Want less admin and more time on the tools? The free Built Simple app puts 45 calculators on your phone, including concrete quantities, with no signup needed. Download it and have a play.