Immigration firm Fragomen keeps a rolling alert called Minimum Salary Changes Announced, logging each country that has lifted the minimum salary for work permits. Whichever country is on top this month, the pattern is the same for an Australian crew. Minimum pay rates for tradies are set by someone outside your office, they move on a schedule, and they hit your costs whether you were watching or not. Here two separate floors can apply to the same worker, and mixing them up is how a quote that looked fine in March goes thin by September.
Minimum pay rates for tradies come from two different places
The first floor is the award. Most on-site building work falls under the Building and Construction General On-site Award 2020 (MA000020), while plumbing and electrical work sit under their own awards, so a mixed crew can be covered by two or three instruments at once. The Fair Work Commission sets the rates through its annual wage review.
The second floor only applies if you sponsor someone on a skilled visa. The Department of Home Affairs sets a minimum salary for the Skills in Demand visa (subclass 482), which replaced the Temporary Skill Shortage visa in December 2024, and that threshold is indexed on its own cycle. It is the same kind of floor the Fragomen alert tracks in other countries.
Different bodies, different rules, different dates. Most small builders only ever deal with the first one, until the day they want to bring in a skilled carpenter from overseas.
If you only employ locals, the award is your whole floor
The base rate is the smallest part of the cost. On top of it sit the industry and tool allowances, travel allowances, the 25 per cent casual loading, overtime and superannuation at 12 per cent. As pure arithmetic, every $1,000 of ordinary-time wages carries $120 of super before you have counted leave, workers compensation or payroll tax.
Take the live rate from the Fair Work Ombudsman's pay and wages tools, not from a figure you typed into a spreadsheet two winters ago. The stakes have also moved. Since 1 January 2025, intentionally underpaying an employee can be a criminal offence, not only a back-pay bill, so close enough is a worse position than it used to be.
If you sponsor a worker, three numbers apply at once
A sponsored worker has to be paid at least the highest of three things: the award or enterprise agreement rate for the job, the Annual Market Salary Rate (what you pay, or would pay, an Australian doing the same role in the same location), and the visa's own income threshold. The visa never lowers the award. Fair Work protections cover every worker in Australia, whatever their visa.
Then there are costs outside wages: visa application charges, and the Skilling Australia Fund levy that sponsors pay. They are yours to carry, so they only come back through the quote if you spread them across the productive hours that worker will actually work. The current threshold, the fee schedule and whether your trade is on the occupation list are details to take from Home Affairs, not from a blog.
How to quote around a moving floor
The pricing side is simple. It needs a rate sheet that is honest about its date.
- Rate card per person, not per trade. A sponsored carpenter on the threshold and a local carpenter on the award do not cost the same hour. One line called carpenter hides the gap.
- Date every rate. A checked-on date beside each labour rate means a stale one gets spotted before it gets quoted.
- Review both floors in one sitting. Award rates and visa thresholds are both adjusted on an annual cycle. Put the award check, super, your workers compensation renewal and any visa threshold in the same diary entry, then re-check every open quote still inside its validity window.
- Keep wages outside GST. Wages carry no GST, so build labour cost ex-GST and add 10 per cent GST once, on the total, at the bottom of the client's quote.
Good construction estimating software lets you set a labour rate once with the on-costs built in, so a rate change is one edit instead of forty quotes. Keep the award, contract and any sponsorship paperwork attached to the job rather than buried in an inbox, which is what decent construction project management software is for.
Salary floors will keep moving here and overseas. The builder with dated rates and one yearly review finds out on the quote, not at close-out.
If you want somewhere to run your numbers without a spreadsheet, the Built Simple app is free to download on iOS and Android, with all 45 calculators on the free tier and no signup needed to use them.