The Australian Building Codes Board keeps the WaterMark schedule of products and its WM Product database current, and your state plumbing regulator enforces the requirements behind them at the point of install. When an entry changes, the list your plumber answers to moves and the allowance in your quote stays where it was. Here is how the Schedule of Products works and what to do about it before you price a bathroom, a laundry or a whole house.
What the WaterMark schedule of products actually tells you
NCC Volume Three is the Plumbing Code of Australia, and it is free to read at ncc.abcb.gov.au. It requires certain plumbing and drainage products to be certified and authorised before they go into an installation. The schedule is the ABCB's list of product types already decided to need WaterMark certification.
Every product falls into one of three buckets:
- On the Schedule of Products. It must be WaterMark certified. Your licensed plumber cannot install an uncertified one, and that is not a judgement call on the day. Tapware, valves, pipes and fittings are the obvious ones, and the list runs well past those.
- On the Schedule of Excluded Products. The ABCB has decided in advance that it does not need WaterMark. It still has to suit the job, so keep the spec sheet.
- On neither list. A new or unusual product that sits on neither schedule needs assessing before use to decide whether it should be certified. This is where you stop and ask your plumber before you order, not after the boxes arrive.
Enforcement sits with the state or territory plumbing authority at the point of installation. Being on a shelf or in an online listing tells you nothing about whether a product can go into the wall.
Where the schedule bites on a real job
The risk is rarely the tap you chose. It is the item that changes after you quoted.
- Supplier substitutions. A back-ordered mixer gets swapped for an "equivalent". Equivalent in finish is not equivalent in certification, so treat the replacement as a new line item and check it.
- Old stock. Fittings left over from the last job or bought in bulk months ago can be caught when requirements change. Lead content limits for products in contact with drinking water have been through a transition under Volume Three, so confirm the current position with the ABCB before you reuse anything from the shed.
- Client supplied fixtures. The schedule does not care who paid for the box. We cover that case in what to do when a client supplies their own tapware.
Put a line in your quote that plumbing products must be WaterMark certified at the time of install, and that a swap forced by a non-certified product is a variation plus GST. Agree the mechanism on day one and it stops being an argument.
Check the licence number, not the logo
A logo on a box is a claim. The ABCB's WaterMark Product Search is the check, and you can search by licence or certificate number, brand, model, product type or licence holder.
One detail saves a lot of failed searches. Licence numbers are six digits, so a shorter number printed on a product needs leading zeros added. A number shown as 1234 is searched as 001234.
The entry shows the licence number, the expiry date, the certification body and the products listed under that licence. Screenshot it with the date visible. Entries change, which is why a check at quote stage can be out of date at fit-off, and we go through that gap in why the ABCB register can change between your quote and your fit-off. The Schedule itself is issued in numbered versions, and more than one has come out in a single year, so note which version you checked.
Keep the evidence with the job
Every job with plumbing in it needs three things on file: the licence number for each scheduled product, a dated screenshot of the database entry and the version of the schedule you checked. When your plumber or the regulator asks, it is one search instead of a hunt through texts and camera rolls. The same file feeds your handover pack, which we cover in what the ABCB product database means for your quoting and your handover.
If those records live across utes, inboxes and phones, the fix is one place per job. Our guide to job management software for tradies covers what to look for.