TL;DR: The cost to build a deck Australia wide in 2026 runs at roughly $180 to $350 per m² for treated pine, $300 to $550 for merbau and $280 to $550 for composite, supply and install, GST included, going by published cost guides. Those rates suit a simple deck. Footings, slope, height, access, balustrade, stairs and any bushfire or engineering requirement are priced on top. For several of those we could not find a checkable 2026 figure, so we say so.
The cost to build a deck Australia wide has moved enough in two years that a rate you wrote down in 2024 will probably leave you short. Published 2026 guides put a basic treated pine deck at about $180 to $350 per m² and a hardwood or composite deck at $280 to $600. Those numbers are real, but they describe only part of the job. This guide breaks the price into the lines a builder actually quotes, so you can see where a deck quote moves and defend each line when a client pushes back.
Where these numbers come from, and what they leave out
Australia has no single official price list for decks. Every dollar figure here comes from published 2026 cost guides, mainly whatsthedamage.com.au and Yellow Pages, with Oneflare and Airtasker for comparison. These are commercial sites and some exist to generate leads. They disagree with each other, and sometimes with themselves. One national page lists treated pine at $180 to $350 per m² in one place and $200 to $400 in another. Where we could not find a figure we could stand behind, we say so instead of guessing.
Use the ranges to sanity-check your supplier prices and your own take-offs. They do not replace either.
Scope matters as much as price. A per m² rate usually describes the deck surface and a simple frame. Balustrades, steps and elevated construction are often priced separately, so confirm what a quoted rate includes before you compare it with yours.
The cost to build a deck Australia wide, per m² by material
These are national supply and install ranges, GST included, from the whatsthedamage.com.au 2026 guide, which says its prices were verified in July 2026.
| Material | National range | Typical | Melbourne range |
|---|---|---|---|
| Treated pine | $180 to $350 per m² | $260 | $190 to $370 |
| Merbau | $300 to $550 per m² | $420 | $315 to $580 |
| Spotted gum | $350 to $600 per m² | $480 | not published |
| Composite | $280 to $550 per m² | $400 | $295 to $580 |
Cities move the numbers. The same guide has Hobart composite at $250 to $495 per m² and pine at $160 to $315. Canberra composite is $310 to $605 and Darwin composite is $320 to $630, the highest of the cities covered. Its Melbourne page reports prices up about 3.4% over the year to July 2026.
Yellow Pages gives a wider spread again, from $200 to over $1,000 per m², with basic treated pine starting around $200. Some guides carry lower rates, such as Oneflare's $150 to $250 for pine and $250 to $350 for merbau, and we could not confirm when those were last updated. If a guide does not say when it was last updated, do not quote from it.
Applied to a 25 m² deck (5 m by 5 m), before extras:
- Treated pine: $4,500 to $8,750
- Merbau: $7,500 to $13,750
- Spotted gum: $8,750 to $15,000
- Composite: $7,000 to $13,750
The same sources put a 25 m² hardwood deck at about $8,000 to $16,000 all up nationally, and a medium 25 m² deck in Melbourne at $8,400 to $16,800. Both totals sit above what the per m² ranges multiply out to. The likely reason is extras, and extras are where margin gets lost.
Key takeaway: A per m² rate is a starting range for a simple deck. The real price is that rate plus substructure, height, access and the extras.
What timber, composite and frame hazard class do to the price
Treated pine is the cheapest board and the cheapest frame. Merbau and spotted gum cost more up front and need regular oiling to hold their colour. Composite boards cost about what merbau does and don't need oiling, but dark boards get hot underfoot in direct summer sun, which matters on a north-facing deck. The fair comparison for a client is cost over ten years, not cost on the day. We found no published 2026 maintenance figure for Australia, so ask your supplier for the recoating interval on the product you are pricing and put it in the quote.
The frame is a separate decision. Treated pine used above ground outdoors is generally H3 under the AS 1604 hazard classes. Anything in or against the ground needs a higher class, H4 or H5. Read the stamp on every length, because the span tables depend on stress grade as well as size.
Substructure: footings, bearers and joists
Substructure is where deck quotes go wrong, because nobody sees it once the boards are down.
Footings. These are concrete pads, stumps or screw piles, depending on soil and height. A Perth cost guide says sandy soil can mean deeper footings or screw piles, adding $500 to $1,500 depending on deck size and soil. We could not find a reliable 2026 Australian price per pile. Ask your installer for a price per footing and keep it as its own line. Work out your concrete quantity in bags with our concrete calculator before you ring the supplier.
Framing. Bearers and joists are sized from the span tables in AS 1684.2 (non-cyclonic areas) or AS 1684.3 (cyclonic areas), by stress grade, section and spacing. Dropping a joist size to save a few dollars buys a bouncy deck and a call-back. Labour-only deck framing is listed nationally at $60, $90 and $140 per m² (low, typical, high), and at $69, $105 and $160 in Sydney.
Termites. A deck fixed to the house can bridge or hide the termite management system. Our post on AS 3660 termite protection covers what you must install and what you have to certify.
Slope. A sloping block means longer posts, more bracing and more concrete per footing. Measure each post length instead of averaging the fall.
Height and access loadings
We could not find a published, checkable percentage for height or access loadings in Australia, and we would be wary of any flat figure. Price them as labour, hire and delivery lines instead.
Height first. Under the NCC 2022 Housing Provisions, Part 11.3, a barrier is required where a deck sits 1 m or more above the surface below. Openings must not let a 125 mm sphere through. Since NCC 2022 the gap between a face-mounted barrier and the deck edge is capped at 40 mm, as the ABCB explains. Confirm the clause for your building class before you design. Above that line, expect longer posts, more bracing and a better chance you need an engineer and an approval.
Falls add cost too. In jurisdictions that follow the model WHS laws, construction work with a risk of a fall of more than 2 m is high risk construction work and needs a safe work method statement. Check Safe Work Australia and your state regulator, then price edge protection or scaffold as its own line.
Access is the quiet one. Every metre a crew carries timber, and every bag of concrete wheeled through a side gate, costs hours. Walk the site, measure the carry distance, photograph the path and write it into the scope.
Balustrade, stairs and the other extras
Balustrade is the extra that surprises clients. Yellow Pages' 2026 guide has timber and wire balustrade starting at $180 per metre and glass at around $320 per metre. A Gold Coast guide puts wire at $120 to $345 per linear metre, typically $195. Take a 5 m by 5 m deck against the house with barrier on three sides (15 m). That is $2,700 at $180 per metre and $4,800 at $320, before stairs. We could not confirm that those per metre rates include posts and installation on every product, so check with the installer.
Stairs, pergolas and roofs are priced on their own. We found no reliable 2026 price per step, so build stairs up from stringers, treads, landings and their own barrier.
Bushfire can change the material list. In a bushfire-prone area, the BAL under AS 3959 limits what decking and framing you can use, and non-combustible options can cost more. In NSW, for example, the exempt development rules require non-combustible materials for a deck less than 5 m from a house on bushfire-prone land.
Approvals are the other line. In NSW a deck can be exempt development if it is no more than 25 m², no more than 1 m above existing ground, at least 900 mm from each boundary and behind the front building line, with further limits listed on the NSW Planning Portal. Other states have different thresholds, and council, heritage and flood overlays can override the general rule. Ask the council or your private certifier before you price, and carry engineer and certifier fees as provisional sums.
Labour, GST and quoting when prices move
Published guides put general carpentry at about $55 to $130 an hour nationally, with Airtasker at $60 to $100. Award minimums for an employed carpenter sit well below that. Check the current Fair Work pay guide for the Building and Construction General On-site Award 2020 (MA000020) and cost your crew at the full loaded rate.
The guide figures above include GST. If your supplier prices and take-offs are ex-GST, add 10% once at the end, not line by line, so rounding does not drift.
Material prices are moving too. Secondary summaries of the ABS June quarter 2026 producer price release put house construction output prices up about 2.0% for the quarter and 5.9% for the year. Treat that as a pointer and check the ABS release before you quote it to a client. For a deck quote, it means timber prices expire. Put a short validity period on the quote and a provisional sum on anything you cannot see, with footings the usual one. Our post on building material price increases covers how to word it.
Allow for waste on boards. Around 10% is common on straight runs, and more for diagonal or herringbone patterns.
Putting a deck quote together
Number the lines so nothing gets missed:
- Measure deck area, finished height above ground and the longest post.
- Footings: count, type and a price per footing.
- Framing: bearers, joists, bracing and fixings, with waste.
- Decking boards, with waste, plus fixings and finish.
- Barrier length and type, then stairs.
- Access and height lines: carry distance, hire, edge protection.
- Engineer, certifier and permit fees as provisional sums.
- Contingency, then GST once.
Keep each line against the job so variations are easy to trace. If you want quotes, variations and invoices in one place, our rundown of the best construction project management software in Australia is a good starting point.
Frequently asked questions
How much does a 20 m² deck cost in Australia in 2026?
Using the national ranges above for a simple deck, about $3,600 to $7,000 in treated pine, $6,000 to $11,000 in merbau and $5,600 to $11,000 in composite, GST included. That excludes balustrade, stairs, approvals and difficult sites.
Is composite cheaper than hardwood?
Not clearly. The published national ranges overlap: composite $280 to $550 per m², merbau $300 to $550 and spotted gum $350 to $600. The difference shows up later, in maintenance.
Do I need a permit to build a deck?
It depends on the state, the council and the site. In NSW a low deck can be exempt development if it meets the criteria above. Elsewhere the thresholds differ, and bushfire, heritage and flood overlays can apply. Ask the council or a certifier before you price.
Why do two quotes for the same size deck differ so much?
Scope. One quote includes balustrade, stairs, engineered footings and an approvals allowance. The other covers boards and a simple frame. Compare them line by line.
Do these prices include GST?
The 2026 guide figures in this article do. If your own costs are ex-GST, add 10% at the end.