TL;DR: Every residential build has to get roof and surface water to a legal point of discharge (LPOD) that council nominates. That might be the kerb, a council pit, an easement through the neighbour's block or a soakwell on site. The NCC sets the national floor: water collected by the building can't damage or be a nuisance to other property, and it can't get into the building. Councils and states set nearly everything else, including whether you need an on-site detention tank, how big it is and how it discharges. Get the LPOD in writing before you quote or set out the slab. Grade the ground away from the building, put subsoil drains where groundwater or retained soil needs somewhere to go, and keep stormwater out of sewer. When council rules and this guide disagree, council wins.
Stormwater gets less attention at quote stage than anything else on a house build, and more than anything else at handover. That's when the neighbour complains, the slab edge sits in a puddle or the building surveyor won't sign off on final. This guide covers the stormwater requirements residential builders in Australia have to meet: where the water is legally allowed to go, when council wants a detention tank, how to grade the site, where subsoil drains belong and where one council's rules look nothing like the next one's.
One thing up front. The National Construction Code sets a national minimum, but council and state requirements decide most of the detail on any given block. Use this as a map of what to ask and what to check. Then confirm against your approved plans, your engineer's drawings and the local rules.
Stormwater requirements residential: what the NCC actually asks for
Drainage for houses sits in NCC 2022 Volume Two, Part H2. Like most of the NCC it's written as performance requirements. Surface water collected or concentrated by a building or site works has to be disposed of without damaging or being a nuisance to other property, and surface water must not get into the building. You can read the current wording free on the NCC website.
Most builders meet those requirements through the deemed-to-satisfy route. That means the drainage part of the ABCB Housing Provisions Standard for site and surface water, the roof drainage provisions for gutters and downpipes, and AS/NZS 3500.3 for stormwater drainage design and installation. Your plumber or drainer works to AS/NZS 3500.3, and in most states stormwater drainage is licensed plumbing work that needs a compliance certificate when it's done.
The roof drainage provisions are where builders most often get caught on detail. Downpipes are generally limited to serving no more than 12 m of gutter each, and they need to sit as close as possible to valley gutters. If a downpipe is more than 1.2 m from a valley, an overflow is required. Gutter and downpipe sizing comes from rainfall intensity for your location, so a roof that drains fine in Adelaide may be undersized in Cairns. Check the tables in the current edition rather than copying the last job.
Two points matter on every build. The NCC doesn't tell you where the water ends up, because council does that. And meeting the NCC doesn't excuse you from a council condition that asks for more.
The legal point of discharge: sort it before you quote
The legal point of discharge is the place council says your stormwater system is allowed to connect to. Common LPODs are:
- Kerb and channel, through a kerb adaptor, usually on lots that fall to the street
- A council stormwater pit or underground main, often in the street or a drainage reserve
- An interallotment drainage easement, a pipe running through a downhill neighbour's land, typical on lots that fall away from the street
- On-site disposal, such as a soakwell, absorption trench or rubble pit, where there is no piped system or the soil drains freely
How you find out depends on the state. In Victoria you apply to council for a legal point of discharge report under the Building Regulations 2018. It sets the connection point and sometimes conditions such as a detention requirement, and council charges a fee. In other states the information usually comes through the DA or CDC conditions, a council stormwater policy or an engineering assessment. Our building permits guide covers how those approval pathways fit together.
Key takeaway: if you don't have the LPOD in writing, you don't know what the stormwater costs. A kerb connection 8 m from the house and an easement connection 40 m down the back of three neighbours are completely different jobs.
Get it before you price the job, and before the slab is set out. The depth and location of the LPOD sets the invert levels for the whole system. If the connection point is shallow and the house sits low, there may not be enough fall to get there by gravity at all.
Uphill blocks and interallotment drainage
Lots that fall away from the street are where stormwater gets expensive and political. If there's an existing interallotment drainage easement on title, you connect into it at the point council nominates. If there isn't one, you usually have three options, and none of them is quick:
- Negotiate an easement with the downhill owner. It needs their written consent, a survey, legal documents and registration on both titles. Neighbours can say no, or ask for money.
- Pump to the street. Many councils treat a pump-out system as a last resort, and some won't accept it for roof water at all because a dead pump during a storm floods someone. Where it's allowed, expect conditions around a holding sump, a backup pump and an alarm.
- A charged (wet) system. Downpipes run underground full of water and rise to discharge at a higher point, often through a rainwater tank. It only works when there's enough height difference between the roof and the outlet, and councils vary on whether they'll accept one.
Be careful with an existing easement pipe. Find out its size and condition before you assume it'll take another house's worth of roof water, particularly when you're adding a second dwelling. Our granny flat cost guide is a good reminder that site works, drainage included, are where secondary dwelling budgets blow out.
Detention tanks and retention tanks: not the same thing
Builders, clients and some council officers use these terms interchangeably, and they shouldn't.
- A retention tank (a rainwater tank) stores water to be used: toilets, laundry, garden. When it's full, it overflows to the stormwater system.
- A detention tank (on-site detention, or OSD) holds water during a storm and lets it out slowly through a sized orifice. The point is to protect the downstream drainage network, not to store water for later.
Some sites need both. A combined tank holds a retention volume for reuse at the bottom and a detention volume above it, which drains down after each storm through the orifice outlet.
OSD is triggered by council policy, not the NCC. Triggers are commonly tied to site area, impervious area, the catchment or the capacity of the downstream system, and the requirement can apply to a single new house, a knockdown rebuild or an extension. Where OSD is required, expect:
- A hydraulic or civil engineer's design, with tank volume and orifice size calculated to council's method
- Council approval of the stormwater plan, sometimes as a condition you have to satisfy before construction certificate or building permit
- Works-as-executed drawings and an engineer's certification at the end
- In some councils, particularly in parts of Sydney, a positive covenant and restriction on title so future owners have to maintain the system
Don't hand-size a detention tank from the last job. Orifice plates are tiny, often a few tens of millimetres, and a plate drilled to the wrong size or left out to "improve flow" is a common reason final certification fails.
Surface grading and slab heights
Getting water to the LPOD is half the job. The other half is stopping it reaching the building in the first place.
The Housing Provisions set out grading and slab height requirements. In summary (check the current edition and your engineer's details):
- Ground slope away from the building: the finished surface around the slab has to drain water away. Generally that's at least 25 mm over the first metre for reasonably impermeable surfaces such as concrete or clay paving in low rainfall intensity areas, and at least 50 mm over the first metre in any other case.
- Slab height above finished ground: generally at least 100 mm in low rainfall intensity areas or sandy, well-drained sites, 50 mm above impermeable paved or concreted areas that slope away from the building, and 150 mm in any other case.
- Suspended floors: ground under a suspended timber floor, whether framed to AS 1684 or not, needs grading so water doesn't pond under the house. Ponding under the subfloor brings timber decay, termite risk and movement in reactive clay.
Most problems here happen after you've left. Landscapers bring garden beds up to the brick line, pavers get laid level or falling towards the house, and a path along the side boundary turns into a dam. Put finished levels on the drawings, write them into the handover notes and photograph the grading at practical completion. If the owner's landscaper undoes it, you have the record.
On cut-and-fill sites, the uphill cut needs a swale or dish drain to catch overland flow before it reaches the back wall. A retaining wall on that cut needs drainage behind it, which brings us to subsoil drains. Our retaining wall cost guide covers wall sizing and pricing in more detail.
Subsoil drains: where they go and where they don't
Subsoil (agricultural) drains collect groundwater and seepage that surface grading can't deal with. Typical locations are:
- Behind retaining walls, at the base of the drainage backfill
- Along the uphill side of a cut, to stop seepage tracking under the slab
- Around footings on sites where groundwater sits high or seepage is expected
- Around basements and below-ground walls, together with waterproofing
A standard detail is slotted pipe, often in a filter sock, laid in a bed of clean aggregate wrapped in geotextile and falling continuously to an outlet. Include inspection and flushing points so the line can be cleaned. Where the subsoil line joins the stormwater system, most designs bring it in through a silt pit rather than straight into a pipe, so sediment doesn't block the main line.
Things to avoid:
- Never connect stormwater or subsoil drains to sewer. It's illegal in every state, and water authorities do test for it.
- Don't run a subsoil drain level or uphill. A drain without fall is a water storage trench beside your footings.
- Watch reactive sites. On M, H1, H2 and E class sites under AS 2870, adding or removing water near footings drives movement. Follow the engineer's footing and drainage details rather than adding ag pipe out of habit.
Where councils differ
No national template exists below the NCC. A few of the patterns builders run into:
- Victoria: the LPOD report is a formal step. For two or more dwellings on a lot, the planning scheme can require a stormwater assessment, and Melbourne Water's STORM calculator is widely used to show compliance. The ResCode permeability standard generally requires at least 20 per cent of the site to be free of impervious surfaces.
- New South Wales: OSD requirements are common across metropolitan Sydney and vary council by council, often set out in a development control plan. BASIX can separately require a rainwater tank to meet water targets, which is a different requirement from OSD.
- Queensland: council planning schemes and the Queensland Development Code set the detail. Tank requirements have changed over the years, so confirm what applies to your lot today rather than going on memory.
- Western Australia: on sandy coastal sites, many Perth councils expect all roof water to be disposed of on site through soakwells, sized using the council's own method, rather than piped to the street.
- Everywhere: flood-affected lots, overland flow paths and bushfire-prone land can each add conditions such as raised floor levels, flood-compatible materials or limits on fencing that blocks flow. Check the planning certificate and overlays.
If you build across more than one council area, keep a short note on each council's stormwater policy, LPOD process and OSD trigger. The lot that catches you out is usually the one where you assumed the rules matched the last council.
Getting stormwater right in the quote and the program
A few habits stop drainage being where your margin goes:
- Price from the LPOD, not a guess. If the LPOD isn't confirmed at quote stage, carry stormwater as a clearly defined provisional sum. State what it covers (metres of pipe, pits, tank, connection) and show it inclusive of GST, the same as everything else in the contract price.
- Get the plumber in early. A drainer who walks the site before the slab is set out can tell you whether the levels work. Our plumber hourly rates guide has current figures for budgeting that time.
- Connect downpipes early. Many councils expect roof water connected to stormwater, or at least to temporary downpipes, as soon as the roof is on. Water dumping off an unguttered roof erodes the site and sends sediment into the street.
- Keep the paperwork together. The LPOD report, stormwater plan, engineer's certification, plumber's compliance certificate and works-as-executed drawings all end up in front of the building surveyor at final. Store them against the job, not in someone's email.
- Record what's buried. Photograph pipe runs, pits and junctions before backfill, with a tape in shot. The next person to dig on that site will thank you, and it may be you.
Frequently asked questions
Who decides the legal point of discharge?
The local council, as the stormwater authority for its area. In Victoria it's issued as a formal report on application. Elsewhere it usually comes through DA or CDC conditions or council's stormwater policy. Your plumber or engineer can't set it on their own.
Do I need a detention tank for a single new house?
It depends entirely on the council and the site. Some councils require OSD for every new dwelling in certain catchments. Others only for larger lots, high impervious areas or sites draining to a constrained system. Check the council's stormwater policy or DCP before you quote.
Can a rainwater tank count as my detention tank?
Not usually. A full rainwater tank has no spare capacity when the storm arrives, so it does nothing to slow peak flows. A combined tank with a separate detention volume and orifice outlet can do both jobs, but only when it's designed and approved that way.
Can stormwater go into the sewer if there's no other option?
No. Connecting stormwater or subsoil drainage to sewer is illegal in every state. If there's no piped LPOD, the options are an easement, a pump or charged system, or on-site disposal, depending on what council approves.
Who's responsible if the owner's landscaping later causes water to pond against the slab?
That's a contract and evidence question as much as a technical one, so get advice for your situation. What helps you is documented finished levels, photos of the grading at handover and clear written advice to the owner about keeping ground levels below the slab edge and falling away from the house.
The short version
Confirm the LPOD in writing first. Find out whether council wants detention, and get it engineered if so. Grade the ground away from the building to the NCC minimums, put subsoil drains where groundwater or retained soil needs a way out, and keep every bit of it out of the sewer. Then keep the paperwork, because stormwater is one of the last things the surveyor checks.
If you want quick numbers on site without opening a laptop, the free Built Simple app has our construction calculators on your phone, with no signup needed. Download it from the App Store or Google Play and have a play next time you're measuring up.