Bathroom renovation cost Australia

TL;DR: The cost guides published in Australia in 2026 put a bathroom renovation at roughly $8,000 to $15,000 for a budget or cosmetic job. A mid-range full strip-out sits at $15,000 to $35,000 (some guides go to $40,000), and high-end work starts at $35,000. Premium jobs in capital cities go past $60,000. Two line items move a quote more than anything else. The first is waterproofing, which has to meet AS 3740 under the NCC at any budget. The second is moving the plumbing. If the toilet, shower and vanity stay where they are, the job usually stays in the lower half of its range. These figures are a rough guide and include GST. They don't replace a measured quote.

Ask ten clients what a bathroom costs and you'll get ten numbers, mostly from a renovation show. The bathroom renovation cost Australia builders actually quote in 2026 depends less on the tiles the client picks and more on two things they rarely think about: what's under the tiles, and whether the toilet is moving. This guide covers the ranges published this year, what each level buys, why waterproofing and plumbing moves can change a quote by thousands, and how to price a wet area so your margin survives the job.

First, a word on the numbers. No official dataset tracks residential bathroom costs. The ranges below come from cost guides published in 2026 by Australian renovators and trade platforms, and they don't agree at the edges. Several are written by businesses that sell renovations, so use them as a sense-check, not a price list. Your own past jobs are better evidence than any of them.

Bathroom renovation cost Australia: the 2026 ranges

Level Indicative range (incl. GST) Typical scope
Budget or cosmetic $8,000 to $15,000 Same layout. New vanity, tapware, shower head and toilet suite, paint, regrouting or partial retiling
Mid-range $15,000 to $35,000 (some guides to $40,000) Strip-out to the frame or slab, new membrane, floor and wall tiles, vanity, toilet, tapware, lighting, exhaust fan, shower screen
High-end $35,000 and up Floor-to-ceiling tiles, custom joinery, freestanding bath, niches, underfloor heating, layout changes, premium fixtures

Location matters too. One independent guide updated in July 2026 puts Sydney at:

  • basic from $11,500
  • mid-range $23,000 to $40,250
  • premium $63,250 and up.

The same guide puts Brisbane at:

  • basic from $10,000
  • mid-range $20,000 to $35,000
  • premium $55,000 and up.

Ensuites usually cost less than a main bathroom because they're smaller. One guide estimates 20 to 30 per cent less. We couldn't find a reliable source for Melbourne, Perth, Adelaide or Hobart on the same basis, so we've left them out rather than guess.

One more point before the detail. The bottom of every range assumes the work is compliant. A quote well under the budget figures for a full strip-out usually means something is being left out, and in a wet area that is nearly always the membrane, the plumbing certificate or both.

What each level actually buys

Budget jobs keep everything where it is. Most of the money goes on fixtures and finishes: a new vanity, toilet suite, tapware, mirror and paint. The catch is that a cosmetic job can't fix a membrane that has failed. If the shower floor sounds hollow, the grout is staining or the skirting outside the bathroom is swelling, the client doesn't have a cosmetic job any more. Lifting a shower floor tile usually damages the membrane underneath, so retiling the shower turns into a wet-area rebuild.

Mid-range is where most full renovations sit. The room comes back to the frame or slab, and that means the waterproofing has to be redone to the current standard. Plumbing and electrical get a new rough-in, the walls get new wet-area sheeting and the room is tiled again. The fixtures are good quality but come off the shelf.

High-end costs more mostly because of labour hours, not the price of the tiles. Large-format tiles, mitred edges, recessed niches, linear drains and level-entry showers all add tiling and preparation time. Underfloor heating adds an electrician and floor build-up. Custom joinery adds lead time that has to be planned into the programme. High-end jobs are also the ones most likely to move fixtures, which brings us to the two swing factors.

Swing factor one: waterproofing

In Australia, waterproofing wet areas is a code requirement, not an upgrade. For houses, the NCC Housing Provisions deal with wet areas in Part 10.2 and call up AS 3740-2021 Waterproofing of domestic wet areas as the way to comply. You can read the current provisions free on the ABCB's NCC site. In short, the shower area, the bathroom floor, the joins between walls and floor, and every pipe penetration have to be treated to the standard. Shower walls have to be waterproof to at least 1800 mm above the floor. Membranes have to meet AS/NZS 4858. Our AS 3740 waterproofing guide goes through each clause in detail.

The membrane itself is rarely what makes this line item swing. The swing comes from what the strip-out uncovers:

  • Rotten or unsuitable substrate. Old sheet flooring, swollen particleboard or water-damaged joists all have to be replaced before any membrane goes down.
  • Wrong falls. If the existing screed doesn't fall to the waste properly, it has to come up and be laid again.
  • Level-entry or hobless showers. These need a set-down, which means a recess in the slab or lowered joists on a timber floor. On an existing house that is structural work.
  • Upper-floor bathrooms on timber. Any failure here is a ceiling repair in the room below, so the substrate and detailing deserve more care and more time.

Licensing for waterproofing differs from state to state, and some states treat it as its own trade. Check what applies where the job is. At any budget, get a waterproofing certificate from whoever applies the membrane, and take dated photos before the tiler covers it. Once it's tiled, those photos are your only proof.

Key takeaway: Price the membrane as a fixed item. Price fixing whatever you find under the old floor as a separate provisional sum. No one can see the substrate until demolition is done, so don't let your fixed price cover it.

Swing factor two: relocating the plumbing

Leaving fixtures in place is the biggest single saving in a bathroom renovation. Every published guide we read agrees on this, and it matches what builders tell us. Moving fixtures means new drainage, new water lines, new compliance work and often new structure.

The toilet is usually the most expensive thing to move. It needs a 100 mm drain with enough fall to reach the existing sewer line. Over the distance some clients want, that fall may simply not be available.

  • On a slab, the concrete has to be cut and broken out for the new drain line, and the trench gets bedded, backfilled and patched. The concrete bags calculator works out the patch before you leave site.
  • On a timber floor, the joists are the limit. AS 1684 restricts where joists can be notched or drilled and by how much, so a new drain line may need trimmers or an engineer's sign-off rather than a hole cut wherever it fits.

Moving the shower means a new waste and new falls. If it's going to be level-entry, it also needs a set-down, so it hits both swing factors at once.

Moving the vanity is normally the cheapest move. Water and waste only shift within a wall cavity that's already open.

All of this is licensed plumbing work under the Plumbing Code of Australia (NCC Volume Three), and the plumber has to issue a compliance certificate. Plumbing labour is one of the largest costs in the job, so it pays to understand how plumbers charge. Our guide to plumber hourly rates in Australia covers what's typical in 2026. For relocations, get the plumber to look at the site and give you a fixed price for the rough-in before you send your quote. Hourly plumbing on a job with unknown drainage is how a bathroom loses its margin.

The other line items that add up

Waterproofing and plumbing are what change the price. These are the items that build it:

  • Demolition and waste. Skip bin, labour and disposal. In homes built before about 1990, the wall and floor sheeting in wet areas may contain asbestos. Removing more than 10 m² of non-friable asbestos needs a licensed removalist, and that cost and timing have to go into the quote.
  • Electrical. Lighting, power to the vanity, heated towel rails and the exhaust fan, all installed by a licensed electrician. Under the NCC, bathroom exhaust now has to be ducted outside, not into the roof space. Our guide to NCC condensation requirements explains the fan and ducting rules.
  • Glazing. Shower screens are covered by AS 1288 and have to be Grade A safety glass. Frameless screens cost more than semi-frameless, and the price gap is something the client chooses, not a compliance issue.
  • Tiling. Measure the area and allow for waste. Large formats, herringbone and niches all slow the tiler down.
  • Fixtures and tapware. If the client supplies their own, check it is WaterMark certified before the plumber installs it. Uncertified tapware is a compliance problem for the plumber, not just a quality question.
  • Contingency. Older houses always uncover something. A contingency written into the contract is easier to talk through than a variation in week two.

GST, insurance and the paperwork

GST. The published ranges are figures for homeowners and generally include GST. If your turnover is $75,000 or more, you have to be registered for GST. Show it clearly on the quote so the client compares like with like.

Home warranty insurance and contracts. Each state sets its own threshold for when residential work needs a written contract and home warranty insurance, and a mid-range bathroom can easily go over it. In NSW, for example, Home Building Compensation Fund cover is required for residential work over $20,000. Check the threshold in your state before you sign.

Approvals. A like-for-like internal bathroom renovation generally doesn't need a building permit. Structural changes, set-downs in a slab, heritage overlays and apartments are different. For any strata bathroom, assume you'll need body corporate approval under the building's by-laws and allow time for it.

How to quote a bathroom so the margin survives

  1. Inspect before you price. Tap the floor tiles to find hollow spots, take moisture readings around the shower and check the room underneath or the subfloor. Note the age of the house for asbestos risk.
  2. Split the quote into three parts. Put the defined scope at a fixed price. Make substrate repairs and other unknowns provisional sums. List client-selected fixtures as prime cost items with the allowance stated. When the client upgrades the tapware, that's a PC adjustment, not an argument.
  3. Lock in the subcontractor prices first. Get fixed rough-in prices from the plumber and electrician before you commit to a total.
  4. Programme the cure time. The usual order is strip-out, rough-in, sheeting, membrane, cure, tile, fit-off. The membrane cure time comes from the manufacturer, and a tiler booked a day too early is a day of the job lost.
  5. Document the hidden stages. Photograph the plumbing rough-in, the membrane and the flood test if you do one. Keep the certificates with the job file.

Frequently asked questions

How much does a small bathroom renovation cost in Australia?
Less than a large one, but not as much less as clients expect. Tiles and tiling labour scale with floor area. The plumber's call-out, the electrician, the waterproofing, the waste and the compliance paperwork mostly don't. So a small bathroom often costs more per square metre than a big one. The budget-to-mid figures above are a fair starting point. One guide puts ensuites 20 to 30 per cent below main bathrooms.

Is waterproofing required for a bathroom renovation?
Yes, wherever the work disturbs the wet-area surfaces. The NCC calls up AS 3740 for domestic wet areas, so any new shower, floor or wall-floor join has to be waterproofed to that standard, with a membrane that meets AS/NZS 4858. A cosmetic refresh that leaves the existing tiles and membrane alone may not trigger it. Lifting the shower floor will.

How much does it cost to move a toilet in a bathroom renovation?
We haven't found a reliable published figure to quote, and the honest answer is that it depends on the floor. On a slab you are cutting, trenching and patching concrete. On timber you are working within AS 1684 limits on notching and drilling the joists. Either way, available fall to the sewer line can rule out some positions altogether. Have the plumber inspect the site and give you a fixed price.

Can you tile over existing bathroom tiles?
Sometimes, on walls outside the shower, if the old tiles are firmly bonded and the adhesive maker allows it. It doesn't fix a failed membrane, it raises the floor level at doorways and drains, and it hides problems you'd want to see. In and around the shower, stripping back is the safer call.

Do I need council approval for a bathroom renovation?
Usually not for like-for-like internal work. Structural changes, heritage-listed properties and apartments are the common exceptions. Strata bathrooms almost always need body corporate approval first. Check with your local council or private certifier if there's any structural work in the scope.

Price the next one with the job in your pocket

A bathroom quote is only as good as the measure behind it. The free Built Simple app puts our construction calculators on your phone with no signup needed, so you can work out tile areas, concrete patches and quantities on site while you're standing in the room. Download it before your next measure-up.

Related: Construction costs Australia: what the home supply survey means for your quotes